Knowledge Centre

Monitoring & Supervision of Groundwater Dewatering on Construction Site.
SMARTREK TECHNOLOGIES Smartrek is trusted by construction dewatering professionals to have a real-time insight into their field operations, improve the management of their projects, eliminate unnecessary...

Case Study – Great Wakering – Wellpoint Dewatering (EA Consent)
Stuart Wells Limited Stuart Wells Limited are a specialist dewatering and water management contractor. With 40 years’ experience offering professional and cost-effective solutions to groundwater challenges...

Groundwater Treatment Project of the year – TDI Award Finalist
The Hölscher Group is a medium-sized globally operating company with numerous international subsidiaries. They offer a comprehensive range of services in the fields of dewatering, well drilling, water treatment and groundwater...

Young Professional of the Year – TDI Award Winner
The Hölscher Group is a medium-sized globally operating company with numerous international subsidiaries. They offer a comprehensive range of services in the fields of dewatering, well drilling, water treatment and groundwater...

Wells / Drilling Project of the Year – TDI Award Finalist
Hölscher Group – Project Elzmündung, Kappel Grafenhausen (Southwestern Germany) The Hölscher Group is a medium-sized globally operating company with numerous international subsidiaries. They offer a comprehensive...

Equipment – Material Innovation Project of the Year TDI Award Winner
iFLUX Sensing Discover the latest groundwater innovation, Real-time monitoring of groundwater flow and direction iFLUX delivers the next generation water monitoring solutions, based on a real-time...

Sustainability Excellence Company of the Year – TDI Award Finalist
Umvoto Africa (Pty) Ltd (Umvoto) is a solution orientated, earth science and water resource consultancy, based in Muizenberg, Cape Town. From its founding in 1992, tireless scientific rigour and bold creativity have consistently positioned...

Open Pit Dewatering through a combination of Dewatering wells and Horizontal drain wells in a complex Geological Environment
Hydrogeek developed a 3D groundwater flow model for transient mine inflow estimates for two large open pit mines. The model capitalizes on FEFLOW flexible meshing options...