Ejector Dewatering

Case Studies / 26 May 2021 by Stuart Wells Ltd
Credit :

The Pumping Station was constructed with open-cut batter excavation along western side. With sheet piles toed into the underlying Kimmeridge Clay installed around the remaining sides. Excavation area was Nominal 31m x 22m with excavation level upto 11m BGL.