You know you have a groundwater problem and that dewatering is needed, but what if you decide not to dewater? Controlling groundwater on a construction project is critical to success. Water intrusion can threaten ground stability which can be a major safety concern.
Impact of Site Groundwater
Groundwater can have a significant impact on the overall project duration and cost. Therefore, it is essential to understand the problem and the risks associated with a wet job site. This allows us to make informed decisions about what to do next.
Project Schedule Issues
Staying on schedule is a critical factor of a construction project.
Groundwater can cause delays associated with:
- Dewatering system planning & installation
- Proper Permitting
Risk – Unstable/Unsafe Excavation
Uncontrolled groundwater causes unstable conditions decreasing personnel safety while creating additional liability.
Site water can cause the following:
- Shoring Instability
- Erosion
- Slope Failure
- Site Flooding
- Settlement/Subsidence

Budget Impact
Lack of planning for groundwater control can lead to higher costs throughout the life of an excavation.
Budget & Costs can be impacted due to:
- Permitting, discharge costs, system installation, operation & maintenance
- Project delays while addressing groundwater control (liquidated damages)
- Repairing adjacent utilities/structures due to settlement from soil movement
Mitigate Risks
After we understand the groundwater issues, we can determine the best methodology to mitigate these risks and associated costs. Installing a dewatering system ahead of excavation creates optimal working conditions and ensures your project remains on time, budget, and safe.