Although the fundamental premises underlying the choice of mine dewatering design are the same for all mines, experience on Southern Africa Mines has shown that there are differences between the designs adopted by gold, coal and diamond mines. These are primarily in the areas of approach, methodology, design and application. The major contributing factor to the choice of dewatering design adopted is the initial perceived life-of-mine. Two mines of the same age can have very different designs depending on the original planned life of mine. Case histories are given with details of the dewatering designs.

Related articles

Industry literature / 4 July 2023

Groundwater Scheme Management made easy.

Industry literature / 1 February 2022

Griffin Dewatering Well Design

Industry literature / 7 April 2021

Free Pumping Test Software – University of the Free State

Industry literature / 8 March 2021

Analysis of Development Methods for Gravel Envelope Wells

Industry literature / 12 February 2021

Griffin Dewatering Adviser Tool

Industry literature / 11 February 2021

The Well / Aquifer Model